Project:
|
Studio Addition | ![]() |
![]() |
![]() |
|
Before |
![]() |
First step was fixing the irrigation pipe that was pushed up during the rough winter of 2010 |
![]() |
While I was destroying the back yard, I decided to add more irrigation pipes for drainage. It ws like playing with a big Tonka Toy. |
![]() |
Digging out the foundation. |
![]() |
Pouring the footing. |
![]() |
It rained so much that summer. This was affectionately known as "The Moat". |
![]() |
The foundation. |
![]() |
Ready to pour the slab. |
![]() |
Framing. |
![]() |
All set for now. Ready for windows and siding. |
![]() |
Windows installed, red cedar shingles installed, ready for powerwash & paint. |
![]() |
Finished Studio Exterior |